Free contractor tool
Concrete Footing Calculator
Enter the footing length, width and depth — and how many identical footings — to see the cubic yards, the allowance you choose, and the quantity to order.
Footing dimensions
For a continuous footing, enter the total run length and leave the count at 1. For pads or piers, enter one pad and set how many.
Your number, not ours. RHACOVA does not publish a standard allowance because the honest answer depends on your subgrade, forms and crew.
The step your supplier actually sells in. 0.25 is only a starting value.
Your result
Quantity decision
Order volume
Same volume in cubic feet
Why this number?
cubicInches = count * lengthIn * widthIn * depthIn; cubicYards = cubicInches / 46656; adjusted = cubicYards * (1 + waste); order = ceilToIncrement(adjusted)
Inputs
- Length
- 480.00 in
- Width
- 16.00 in
- Depth
- 8.00 in
- Count
- 1
- Waste allowance
- 10.00%
- Order increment
- 0.2500 cu yd
Results
- Theoretical volume (cu ft)
- 35.56 cu ft
- Theoretical volume (cu yd)
- 1.3169 cu yd
- Waste allowance volume
- 0.1317 cu yd
- Waste-adjusted volume
- 1.4486 cu yd
- Order quantity
- 1.5000 cu yd
Formula concrete.footing · engine shared.concrete@1.1.0 · rectangular-volume · rounding half-even to 6 decimals.
A quantity is not a bid
Cubic yards tell you what to order. What you charge still depends on material cost, loaded labor, equipment, overhead and the margin you need. RHACOVA carries this quantity into the job bid so you price it instead of guessing.
Price this pour: build the job bidStill no account, and nothing you type leaves your device. Signing in only comes up if you choose to save the bid as an estimate.
Continuous footings and pad footings
Both are rectangular prisms, so both use the same arithmetic: length × width × depth, then multiplied by how many. A continuous strip footing is one long run — measure the total centre-line length of the run, including the corners once, and leave the count at 1. Pad or pier footings are identical blocks: enter one of them and set the count.
If a job has strip footings and pads together, or footings of different sizes, run each group and add the order quantities, or add them as sections in the main concrete calculator.
Formula and units
- Cubic inches = count × length (in) × width (in) × depth (in)
- Cubic yards = cubic inches ÷ 46,656
- Waste-adjusted volume = base volume × (1 + your allowance)
- Order quantity = waste-adjusted volume rounded up to your increment
Footings are usually specified in inches for width and depth and in feet for the run, so the calculator converts everything into one unit before multiplying — the most common source of a wrong footing quantity is a feet-times-inches multiplication.
What RHACOVA does not decide for you
This tool takes no position on how wide, how deep or how reinforced a footing must be, on frost depth, bearing capacity, or whether a design meets code. Those are engineering questions answered by the drawings, the soils report and your local jurisdiction. RHACOVA calculates the volume of the footing you describe — nothing more.
Common footing mistakes
- Measuring outside face instead of centre-line on a continuous run, double-counting corners.
- Using the trench width instead of the formed width when the trench over-digs.
- Forgetting that an over-dug trench holds real concrete — that is what the allowance is for.
- Pouring footings and slab the same day but ordering only the slab volume.
Worked example
A 40 ft continuous footing, 16 in wide and 8 in deep, with a 10% allowance and a 0.25 cu yd order increment:
- Base volume: 35.56 cu ft
- Base volume: 1.3169 cu yd
- Waste allowance: 0.1317 cu yd
- Order quantity: 1.50 cu yd
Other concrete quantities
- Concrete Calculator
How many cubic yards does this pour take, whatever shape it is?
- Concrete Slab Calculator
How much concrete does one rectangular slab take?
- Rebar Calculator
How many bars and linear feet does this grid take?
- All RHACOVA calculators
Once the quantity is settled, the next questions are cost, price and profit.
After the quantity: cost, price, profit
- True Job Cost Calculator
A quantity is not a cost. Add material, loaded labor, equipment, disposal and the rest to see what the pour actually costs you.
- Markup & Margin Calculator
Turn that cost into a price, and see the margin the price actually leaves.
Learn the method
- How to Estimate Concrete Cost: Yards, Waste, Job Cost and Price
Estimate the cost and selling price of a concrete job from quantity, contractor-entered prices and job costs.
- What Is True Job Cost?
Know which costs belong in a construction job cost and how to total them.
- Construction Pricing: Cost vs Price vs Profit
Understand the difference between cost, price and profit before pricing construction work.