Free contractor tool
Concrete Slab Calculator
Length, width and slab thickness in, cubic yards out — plus the waste allowance you choose and the quantity you would actually order.
Slab dimensions
Take it from the drawings or your own spec — this tool never chooses a thickness for you.
Your number, not ours. RHACOVA does not publish a standard allowance because the honest answer depends on your subgrade, forms and crew.
The step your supplier actually sells in. 0.25 is only a starting value.
Your result
Quantity decision
Order volume
Same volume in cubic feet
Why this number?
cubicFeet = (lengthIn * widthIn * thicknessIn) / 1728; cubicYards = cubicFeet / 27; adjusted = cubicYards * (1 + waste); order = ceilToIncrement(adjusted)
Inputs
- Length
- 240.00 in
- Width
- 120.00 in
- Thickness
- 4.00 in
- Waste allowance
- 10.00%
- Order increment
- 0.2500 cu yd
Results
- Theoretical volume (cu ft)
- 66.67 cu ft
- Theoretical volume (cu yd)
- 2.4691 cu yd
- Waste allowance volume
- 0.2469 cu yd
- Waste-adjusted volume
- 2.7160 cu yd
- Order quantity
- 2.7500 cu yd
Formula concrete.rectangularSlab · engine shared.concrete@1.1.0 · rectangular-volume · rounding half-even to 6 decimals.
A quantity is not a bid
Cubic yards tell you what to order. What you charge still depends on material cost, loaded labor, equipment, overhead and the margin you need. RHACOVA carries this quantity into the job bid so you price it instead of guessing.
Price this pour: build the job bidStill no account, and nothing you type leaves your device. Signing in only comes up if you choose to save the bid as an estimate.
What a slab quantity actually includes
A slab quantity is the volume inside the forms: plan area × slab thickness. It does not include a thickened edge, a turndown, a footing under a bearing wall or a haunch at a door opening. Those are extra rectangles and they add up faster than people expect — a 12 in × 12 in turndown around a 20 ft × 10 ft slab is roughly another 0.7 cu yd on its own.
If the pour has more than one rectangle, use the main concrete calculator and add a section for each one, or the footing calculator for the turndown.
Formula, units and precision
- Cubic inches = length (in) × width (in) × thickness (in)
- Cubic feet = cubic inches ÷ 1,728
- Cubic yards = cubic feet ÷ 27
- Waste-adjusted volume = base volume × (1 + your allowance)
- Order quantity = waste-adjusted volume rounded up to your increment
Feet and inches are converted in the same shared unit system every RHACOVA calculator uses, with exact decimal arithmetic rather than floating-point. Rounding happens once, for display; the underlying value is never quietly changed to make a number look tidy.
Common slab mistakes
- Forgetting the turndown, the thickened edge and the door haunches.
- Using nominal thickness when the subgrade is 1/2 in low across half the slab.
- Mixing feet and inches in the same multiplication.
- Ordering the base volume with no allowance at all.
What this page is not
RHACOVA calculates from your inputs. It does not determine slab thickness, mix design, reinforcement, joint spacing or code compliance — those are design decisions that belong with the drawings and your engineer.
Worked example
A 20 ft × 10 ft slab at 4 in thick, with a 10% allowance and a 0.25 cu yd order increment:
- Base volume: 66.67 cu ft
- Base volume: 2.4691 cu yd
- Waste allowance: 0.2469 cu yd
- Order quantity: 2.75 cu yd
Other concrete quantities
- Concrete Calculator
How many cubic yards does this pour take, whatever shape it is?
- Concrete Driveway Calculator
How much concrete does a driveway of this size take?
- Rebar Calculator
How many bars and linear feet does this grid take?
- All RHACOVA calculators
Once the quantity is settled, the next questions are cost, price and profit.
After the quantity: cost, price, profit
- True Job Cost Calculator
A quantity is not a cost. Add material, loaded labor, equipment, disposal and the rest to see what the pour actually costs you.
- Markup & Margin Calculator
Turn that cost into a price, and see the margin the price actually leaves.
Learn the method
- How to Estimate Concrete Cost: Yards, Waste, Job Cost and Price
Estimate the cost and selling price of a concrete job from quantity, contractor-entered prices and job costs.
- What Is True Job Cost?
Know which costs belong in a construction job cost and how to total them.
- Construction Pricing: Cost vs Price vs Profit
Understand the difference between cost, price and profit before pricing construction work.